PRC / PRODUCTION LINES & EQUIPMENT

Steel Coil Cut-to-Length Line

Uncoils, levels and transversely cuts metal coil into fixed-length sheets, then stacks the sheets for downstream processing.

Discuss your project ↗
Steel Coil Cut-to-Length LineView equipment photograph ↗
01 / APPLICATION

Application, materials & output

Materials include cold-rolled, electro-galvanized, hot-dip galvanized and prepainted steel, stainless steel, aluminium and copper. Output is fixed-length sheet arranged in stacks.

02 / SPECIFICATION

Specification & selection

ParameterSeries selection reference
Material thickness0.5–4.0 mm
Material width300–1800 mm
Finished sheet length300–6000 mm
Published line speed range70–90 m/min

These figures describe the equipment series. Size, material, speed and capacity limits do not imply that all extremes apply simultaneously to one model. Final selection depends on the product mix and technical proposal.

03 / PROCESS & EQUIPMENT

Process & equipment

  1. 01Uncoiling
  2. 02Levelling
  3. 03Shearing to length
  4. 04Sheet stacking

Uncoiling & levelling

Handles coil feeding and uncoiling, then levels the strip before the cut-to-length section.

Shearing section

Cuts transversely to the target sheet length, with shearing configuration selected for the material and production cycle.

Stacking section

Stacks finished sheets, with configuration agreed for sheet dimensions, stack weight and unloading method.

04 / OPTIONS

Configuration & selection

Specify length tolerance, diagonal and flatness standards, surface protection, maximum stack weight and changeover frequency. High-speed arrangements for thin tinplate or aluminium require separate selection against material and gauge.

05 / UTILITIES

Site & utilities

Provide coil handling and lifting conditions, sheet-stack discharge direction, building / floor conditions, power and adjoining equipment interfaces. Power, foundations and utility demand are determined for the selected specification.

Related equipment

Share your product requirements

Share the material, key dimensions, output and site conditions to discuss the process and equipment configuration.

Share project requirements ↗

Frequently asked questions

Practical answers about selecting equipment and preparing a project. Open a question to read the details.

What information is needed for a useful quotation?

Start with the material grade and applicable standards, incoming and finished thickness and width, coil weight and diameters, or tube and section sizes. Add the product mix, annual tonnage, dimensional tolerances, surface requirements and the intended application. A sample product table is more useful than a single maximum size.

Also state the project location, available workshop space, existing equipment, utilities and target start-up date. Mark undecided items as TBD; PRC can discuss selection assumptions before the technical scope is fixed. A budget range is optional. Final technical and commercial terms are confirmed in the project documents.

Can all published maximum specifications be achieved together?

Not necessarily. A product-family range is not a guarantee that maximum width, thickness, strength, speed and annual output can all be reached at the same time. The feasible operating window depends on the material, product mix, equipment configuration and process conditions.

Annual capacity must account for the pass schedule or line speed, operating hours, coil changes, maintenance and product yield. Thickness tolerance, flatness, coating quality and energy figures require defined measurement and acceptance conditions. Confirm the configuration and test product matrix with PRC rather than combining limits from different models or routes.

What is included in a complete-line project?

The scope may include process and equipment selection, main and auxiliary equipment, electrical systems, automation, interface documents, installation supervision, commissioning and operator training. A complete-line contract does not automatically mean responsibility for the entire factory or every building service.

The technical agreement should identify who supplies foundations, buildings, cranes, external utilities, installation labour, test materials and local approvals. It should also define drawings, deliverables, performance tests, spare parts and service responsibilities. PRC also discusses individual equipment supply and revamps where a complete line is not required.

What site conditions and utilities should the customer prepare?

Prepare the workshop dimensions, floor levels, crane capacity, access and logistics, existing foundations and maintenance clearances. Provide the available electrical supply, cooling water, compressed air, ventilation and any process-specific media relevant to the chosen equipment.

Foundation loads, connection points, supply quality and flow requirements must come from the selected design; generic consumption figures should not be used as construction data. Coordinate material storage, coil handling, emergency access and the boundary between supplier and customer works. Local safety, environmental and construction requirements also need to be considered for the project location.